Redmore Environmental has been involved in a wide variety of projects throughout the length and breadth of the UK. To find out more about the type of assessments we’ve recently delivered then click on the case study links below.

Close Lane, Alsager

Redmore Environmental was instructed to undertake an Air Quality Assessment in support of a residential development on land to the west of Close Lane, Alsager, Cheshire. The proposals included 50 residential dwellings and associated infrastructure to be constructed as Phase 2 of the site. Cheshire Air Quality Assessment Given the size of the development, the … Continued

Portland Street, Manchester

Redmore Environmental was instructed to undertake an Air Quality Assessment in support of the conversion and extension of an existing office at 55 Portland Street, Manchester, with ground floor retail units, construction of a new build 183 bedroom hotel with associated ancillary bar, restaurant and public area, casino and basement carpark. The scheme aimed to … Continued

Ellough Embedded Generators, Suffolk

Redmore Environmental was commissioned to undertake an Air Quality Assessment using dispersion modelling in support of an embedded biodiesel engine generator set consisting of 46 separate units on land off Benacre Road, Ellough, Suffolk. These will act as a backup electricity generating station and operate during peak periods to supply power to the National Grid. … Continued

Fulham Palace Road, London

Redmore Environmental produced an Air Quality Assessment in support of the planning application for a mixed use development consisting of 29 apartments, 410m2 of retail floor space and associated parking on land off Fulham Palace Road. The proposals were to provide new premises for an existing convenience store with residential units above in a highly … Continued

South End Road, London

Redmore Environmental was instructed to undertake an Odour Assessment in support of an artisan bakery and café in Bushey Heath, Camden, North London. The proposals include the refurbishment of an existing building to produce a range of specialist breads, bagels and doughnuts for consumption on and off the premises. Camden Odour Assessment The proposed baking … Continued

Blackfriars Street, Salford

Redmore Environmental was instructed to undertake an Air Quality Assessment in support of a residential development in Salford, Greater Manchester. The proposals included redevelopment and extension of an existing building on Blackfriars Street, to provide 34 residential units and associated infrastructure. Salford Air Quality Assessment The development was located within an Air Quality Management Area … Continued

Cartsdyke Court, Inverclyde

Redmore Environmental was instructed to undertake a Dispersion Modelling Assessment in support of a proposed energy centre at Cartsdyke Court, Greenock, Inverclyde. The scheme included the provision of three 60kW biomass boilers in a self-contained biocabin to produce renewable heat for an existing residential apartment block. This would replace the existing diesel boilers, reducing the … Continued

Kempton Park Racecourse Park and Ride

Redmore Environmental was instructed to undertake an Air Quality Assessment in support of a temporary park and ride site at Kempton Park Racecourse. The facility was proposed to provide car parking for up to 3,000 vehicles during each Rugby World Cup game at Twickenham Stadium. The plans were an integral part of the transport provisions, … Continued

Copp Lane, Great Eccleston

Redmore Environmental was instructed to undertake an Air Quality Assessment in support of a residential development in Great Eccleston, Lancashire. The proposals included 90 units, as well as car park to serve the village, on a greenfield site off Copp Lane. Lancashire Air Quality Assessment Potential air quality impacts associated with the development were identified … Continued